OpenUtilities Electrical (Promis.e)

Integration of PROJECT API BUILDER with ProjectWise

Currently OUS can only run spreadsheets for the Project API Builder from a local drive. Having direct integration with ProjectWise would improve efficiency. Thanks Jess - Essential Energy
about 2 years ago in OpenUtilities Electrical (Promis.e) 0 Needs review

Expression Builder Within Title Block Designer

For a very long time we have been looking for a way to dynamically concatenate project and page variables within title blocks for more flexible way of displaying our client drawing numbers. Currently, users must manually string together variables,...
almost 2 years ago in OpenUtilities Electrical (Promis.e) 0 Needs review

Make current sheet or "default to device ID" the default for Auto Wire Numbering

Because our page templates are a 2 column setup, auto wire numbering by page does not work as it performs this left-to-right, top-to-bottom for the entire sheet, ignoring that there are 2 columns (we utilize "select items"). In addition to this is...
6 months ago in OpenUtilities Electrical (Promis.e) 0 Needs review

Data Manager -> Wire Numbers -> Numerically

When using the Datamanager and viewing the 'Wire Number' tag, the setting the 'Wire Tag' column numerically doesnt set the number value numerically, its done as a text input, i.e it will display wire tag 1, 10 then 1000 next to each other and then...
4 months ago in OpenUtilities Electrical (Promis.e) 0 Needs review

Programmatically executing the Project Publisher's 'Publish' functionality

The Business needs to standardize the settings that controls the creation of an official drawing package as deliverables for the different Business Units (as internal customers). The official drawing packages would be made up of Hyperlinked drawin...
almost 2 years ago in OpenUtilities Electrical (Promis.e) 1 Already exists

User without any role in command protection

Currenlty a user without any roles assigned in Command Protection are able to access all the commands without any restrictions. Hence by implementation of this enhancement one of the below two needs to be implemented incase when a Command Protecti...
over 2 years ago in OpenUtilities Electrical (Promis.e) 0 Future consideration

VISIBLE INDICATOR OF LOSS OF SYNCH TO DATABASES

i suggest that there be some visible indication of a loss of synchronisation between documents and the databases , similar to those indications , such as the "no background map" indication, so that on opening a page you can immediately see there's...
6 months ago in OpenUtilities Electrical (Promis.e) 0 Needs review

Engineering Design Consideration while connecting two wires with different potential using Wire Link

We are facing an issue when the user tries to connect two wires using a wire link and both the wires are on different potential. In this case an Engineering Design Consideration dialog pops up to select the desired potential for the wire. Then in ...
12 months ago in OpenUtilities Electrical (Promis.e) 0 Planned

Promis-e app to have a configuration for Promis-e timeout after maximum single session.

This is a requirement for all the apps used by SOLAR moving forward. This came up after the security assessment. As promis-e data is very sensitive data, we like to get notify some sort when user are working on it. for Example, If a use uses the a...
over 2 years ago in OpenUtilities Electrical (Promis.e) 0 Needs review

device id hiding

on selecting of multiple symbol and By one click we can hide all its same device if.Eg. for terminals we have a same device id so by selecting of all we can hide its device id