Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 83 of 83

Multiplot mit Auswahl von Plotvorlagen

Der Multiplot Aufruf benutzt derzeit immer den zuletzt aufgerufenen Plotrahmen. Gerade für manuell zu erzeugende Planauskünfte (einmaliges Setzen eines Plotrahmens inkl. im Plotrahmen verwendeter Variable (SISNET_PLOT_THEME)) ist es wichtig eine A...
4 months ago in sisNET / Plotting & Printing 3 Needs review

Undo/redo button for placing smartobjects

Need undo / redo button for smartobjects placed by openutilities smartools such as equipment, cables, grids ect.
almost 2 years ago in Substation / Other 2 Planned

UNDO does NOT Work in Substation. Need UNDO in Substation

Undoing actions in Substation does NOT behave as expected. We are told by Bentley Substation Support that the Undo is a MicroStation command and the Undo is not supported in Substation since more operations can be hidden (like e.g. a database acti...
almost 2 years ago in Substation / Engineering Design 1 Planned

Supress Device ID - ON/OFF toggle

A quick toggle ON/OFF button for 'Supress Device ID' would be handy and more efficient than having to enter the Device Properties dialog box each time. Thanks Jess - Essential Energy
over 1 year ago in Substation / Other 0 Future consideration

Programmatically executing the Project Publisher's 'Publish' functionality

The Business needs to standardize the settings that controls the creation of an official drawing package as deliverables for the different Business Units (as internal customers). The official drawing packages would be made up of Hyperlinked drawin...
over 1 year ago in OpenUtilities Electrical (Promis.e) 1 Already exists

More than one file open at a time

Hi, I believe we cannot open more than one file in Substation due to our integration with ProjectWise. This results in great loss of productivity and ease. Instead, we have to open a file/s in read-only from ProjectWise in a different application ...
almost 2 years ago in Substation 3 Will not implement

Engineering Design Consideration while connecting two wires with different potential using Wire Link

We are facing an issue when the user tries to connect two wires using a wire link and both the wires are on different potential. In this case an Engineering Design Consideration dialog pops up to select the desired potential for the wire. Then in ...
4 months ago in OpenUtilities Electrical (Promis.e) 0 Planned

User without any role in command protection

Currenlty a user without any roles assigned in Command Protection are able to access all the commands without any restrictions. Hence by implementation of this enhancement one of the below two needs to be implemented incase when a Command Protecti...
almost 2 years ago in OpenUtilities Electrical (Promis.e) 0 Future consideration

Create symbol on the fly

Hi, During our design/drafting planning stage we may draft up (without any intelligence) a 'dummy' symbol that is required to be formally created as a symbol and part. This allows for spacing in the drawing to be set out and for the designer to de...
almost 2 years ago in Substation / Other 1 Future consideration

Cloud by points/element Tool Default settings

In Microstation we have the ability to set the default settings of the Cloud by point/element tool to an arc radius of 5. I've been advise through a service ticket that the cloud by element/points tool resets every time OUS is started. Therefore h...
over 1 year ago in Substation / Other 2 Will not implement