Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Undo/redo button for placing smartobjects

Need undo / redo button for smartobjects placed by openutilities smartools such as equipment, cables, grids ect.
over 2 years ago in Substation / Other 2 Planned

Oracle Locator: Warnung bei "Alle Geometrien speichern" - "Gesamtes Projekt" und "Fachschalen"

Im Oracle Locator sollte die*der Nutzende analog zur Funktion "Dateitypkonsistenz prüfen" bei Aktivierung der Oracle Spatial Speicherung unter "Gesamtes Projekt" und "Fachschalen" über einen zusätzlichen Dialog "Wollen Sie die Oracle Spatial Speic...
over 1 year ago in sisNET / Other 2 Will not implement

UNDO does NOT Work in Substation. Need UNDO in Substation

Undoing actions in Substation does NOT behave as expected. We are told by Bentley Substation Support that the Undo is a MicroStation command and the Undo is not supported in Substation since more operations can be hidden (like e.g. a database acti...
over 2 years ago in Substation / Engineering Design 1 Planned

Supress Device ID - ON/OFF toggle

A quick toggle ON/OFF button for 'Supress Device ID' would be handy and more efficient than having to enter the Device Properties dialog box each time. Thanks Jess - Essential Energy
over 2 years ago in Substation / Other 0 Future consideration

Data Manager -> Wire Numbers -> Numerically

When using the Datamanager and viewing the 'Wire Number' tag, the setting the 'Wire Tag' column numerically doesnt set the number value numerically, its done as a text input, i.e it will display wire tag 1, 10 then 1000 next to each other and then...
4 months ago in OpenUtilities Electrical (Promis.e) 0 Needs review

More than one file open at a time

Hi, I believe we cannot open more than one file in Substation due to our integration with ProjectWise. This results in great loss of productivity and ease. Instead, we have to open a file/s in read-only from ProjectWise in a different application ...
over 2 years ago in Substation 3 Will not implement

Programmatically executing the Project Publisher's 'Publish' functionality

The Business needs to standardize the settings that controls the creation of an official drawing package as deliverables for the different Business Units (as internal customers). The official drawing packages would be made up of Hyperlinked drawin...
almost 2 years ago in OpenUtilities Electrical (Promis.e) 1 Already exists

User without any role in command protection

Currenlty a user without any roles assigned in Command Protection are able to access all the commands without any restrictions. Hence by implementation of this enhancement one of the below two needs to be implemented incase when a Command Protecti...
over 2 years ago in OpenUtilities Electrical (Promis.e) 0 Future consideration

Create symbol on the fly

Hi, During our design/drafting planning stage we may draft up (without any intelligence) a 'dummy' symbol that is required to be formally created as a symbol and part. This allows for spacing in the drawing to be set out and for the designer to de...
over 2 years ago in Substation / Other 1 Future consideration

Tool to Register a DGN as a Project Page in OUS

Tool to Register a DGN as a Project Page in OUSNeed a tool to register a blank DGN the should get present in Project Folder as a Project Page. The user while registering the page should be able to Add normal variables that can be seen while create...
over 2 years ago in Substation / File Management 0 Planned